BLOG
Notes for trades offices.
Renewals, quotes and the admin around them, written for the firms we build for.
HEATING AND PLUMBING
Gas safety checks done early: how the two-month rule keeps the date
A landlord gas safety check can be done up to two months early without losing the deadline. How the rule works, a worked example, and why adding 12 months to the check date gets it wrong.
ELECTRICAL CONTRACTORS
How often does PAT testing need doing?
PAT testing has no fixed legal interval. What HSE says decides the frequency, its suggested starting intervals for offices, shops and hotels, and how to track a different interval for each client.
HEATING AND PLUMBING
Landlord gas safety renewals: a reminder system that doesn’t slip
How heating firms can keep landlord gas safety (CP12) renewals booked on time: the rules that set the dates, where reminders usually fail, and what a simple system does instead.
ELECTRICAL CONTRACTORS
EICR and PAT retests: keeping long-cycle dates from going quiet
For electrical contractors: what the private rented sector rules say about EICR intervals, copies and remedial work, why PAT intervals vary, and how to track both without a spreadsheet.
BUILT BY ORBIT STUDIO
Building Pingflow: what to automate, and what to leave to the owner
Design decisions from building Pingflow, Orbit Studio’s own WhatsApp booking assistant, and how the same building blocks apply to a trades office.
